20120508

to-kitchen: construction update -- walls and kitchen


the walls of the tatami space continue to be updated by installing the wooden light boxes as well as ventilation duct work.






the steps up to the tatami flooring (which will be installed later) has also been installed.  like most of the wood in to-kitchen, it is japanese cedar.


the duct work has also been installed in the kitchen.


and work on the curved wall between the cafe/ kitchen and the gallery has begun.  






wooden wall covering to be updated soon as well as painting of the wooden light boxes.