to-kitchen: construction update -- painting, lighting


big changes are occurring as the walls get a coat of paint and lighting is installed around the interior

first are a few views around the shop area on the shopping street side of to-kitchen.  the grey concrete walls have received their white finishes and shelving has been installed for the stores goods.






the gallery area had its lighting installed and remaining concrete walls painted as well.  the existing structure left some interesting details such as the location of a removed stairwell, some outlet covers, and an existing wooden column.  





the front cafe area also got a coat of paint and is almost finished



the kitchen interior with all of the appliances installed.  the pre-open testing phase is still a few weeks away, but the store is feeling ready for its opening on july 8th!